RERA No. BRERAP184128040425310829E00
Project Detail

Elevation View

Amenities

  • Unmatched Location
  • Multi-Level Parking
  • Elevators & Escalators
  • CCTV Cameras in Common Areas
  • Power Back Up
  • Integrated Security Features
  • Building Automation System
  • Dedicated WI-FI Zone
  • Air Cooling Ventilation
  • Fire Safety Arrangement

Salient Features



ARCHITECTURAL AND STRUCTURAL
SPECIFICATIONS

Foundation R.C.C. cast in situ foundation as per the structural design.
Super Structure R.C.C. framed structure with AAC bricks masonry in cement mortar as per design & specification of structural consultants.
Doors a) Door frames (RCC / Wooden / Stone choukhats)
b) 32mm thick waterproof flush/ panel door shutters (as per ISI specification)
Window Aluminium / powder coated window
Flooring Vitrified Tiles / Ceramic Tiles
Kitchen Working platform – Granite top with two feet high ceramic tiles and sink (24×18) of standard make
Bathroom a) Provision for hot & cold water connection in all toilets.
b) Flooring: Ceramic Tiles.
c) Dado: colored ceramic tiles up to 7 feet high
d) Sanitary Ware: Glazed vitreous sanitary ware of Paryware or any other standard make.
e) Fittings: All C.P. of Paryware or any other standard fittings of standard make.
f) Cistern: concealed flush cock.
Electrical a) All internal wiring in copper conductor using concealed PVC conduits.
b) At least two T.V. point, one Intercom points provided in each flat.
c) All electrical switches and accessories as per ISI Mark.
d) Adequate lighting/power points, socket, outlets provided in each flat
Internal Wall All internal walls shall be finished with white cement putty
External Wall All external walls shall be painted acrylic paint on white cement putty
Genset & Intercom Generator & Intercom, Electrical connection (B.S.E.B.)
EPBX & CCTV Camera In all flats one point which is connected to the guardroom, ground floor
Lift Provision for lift (standard make lift)
Extra Work Any extra work other than our standard specification shall be charged extra as decided by our authorized engineer and such amount shall be deposited before the execution of work.

Location Map

Construction Update